Particle size should be a confirmation question inside a mould-sealing work package, not an isolated number copied into an RFQ. Luting sand is one of the main consumables in an Aluminothermic Welding system, and the useful request connects the material to the mould sealing task, rail profile, joint condition and welding procedure. Do not invent a particle-size range when the project specification does not define one.

Why particle size belongs in the luting-sand RFQ

Particle size can change how a buyer describes the material, but the description only becomes useful when the supplier understands what must be sealed and how the project will inspect it. A request that says “fine luting sand” without a mould reference, joint condition or procedure leaves too much room for different interpretations.

Start by naming the product as luting sand and state the mould-sealing task. Then show which part of the mould, joint or preparation step the material is intended to support. This keeps the request focused on a real process question instead of an unsupported specification.

Official RMTS luting-sand package.
RMTS luting-sand product identity view.

Define the sealing task before asking for a number

Provide the exact rail profile and grade, mould reference, joint gap and rail-end condition. Explain whether the job is a routine weld, a repair, a worn section, a transition or a changed site condition. Include the welding procedure or project instruction that governs mould preparation and sealing.

These details help the buyer and supplier decide what particle-size question actually needs answering. If the project has a drawing, approved work instruction or internal acceptance checklist, attach the relevant section. A particle-size request should support that defined task, not replace it.

Ask how particle size is controlled and verified

Instead of asking only “What is the mesh size?”, ask a set of linked questions:

  • What particle-size description applies to the requested luting sand?
  • Is the description a nominal value, a range or a project-defined class?
  • How is the value controlled during production or release?
  • Which document, sample or inspection record can the buyer review?
  • Does the proposed material scope change with the mould, rail or procedure?
  • Which acceptance party decides whether the material is suitable for the job?

This wording leaves room for RMTS to confirm the current product information without turning an unverified value into a company promise. It also distinguishes a supplier document from a project acceptance decision.

Keep luting sand, mould and procedure together

Luting sand should not be evaluated separately from the sand mould and the rail-joint work. Keep the product identity, mould reference, rail data, gap condition, procedure and inspection route in one request. If the buyer is also ordering a Thermit Portion, ignitor or crucible, list those components so the complete system can be reviewed.

The verified RMTS luting-sand package establishes product identity. It does not establish formulation, weight, storage life or particle-size value. Use the written RFQ and the requested review documents for those questions.

Actual RMTS luting-sand package beside separated mould-sealing preparation objects.
Luting sand, mould and procedure stay connected during the confirmation review.

Check the wrong-choice risks

The main risk is not that a buyer lacks a single number. It is that a number is accepted without a defined task. A different rail profile, worn end, joint gap or procedure can change the confirmation route. So can a change in storage, transport or site handling conditions.

When the project condition changes, state what changed and ask for a customised configuration or customised solution discussion. Do not carry a previous sand description forward as if it were universal. If the project requires a formal test or acceptance document, identify the document and the approving party rather than implying that RMTS has already passed it.

Luting sand particle-size confirmation checklist

Send the following information with the enquiry:

1. Luting sand as the named product and the exact mould-sealing task. 2. Rail profile, grade, joint gap, rail-end condition and mould reference. 3. Governing welding procedure or project instruction. 4. The particle-size wording, class or range the project expects to review. 5. Requested control, sample, release or inspection documents. 6. Quantity, storage and transport conditions, destination and work schedule. 7. Acceptance route and any changed condition requiring a customised discussion.

The supplier can then answer a defined technical question instead of guessing which particle-size label the buyer intended.

Request a luting-sand confirmation review

Send RMTS the mould, rail profile and grade, joint condition, sealing task, procedure, particle-size question, required evidence, quantity, destination and acceptance route. If a worn section, new procedure or different mould changes the request, ask for a customised configuration or customised solution discussion with those details.

FAQ

Should I specify a particle-size number in every RFQ?

Only when the project has a defined basis. Otherwise describe the sealing task and ask RMTS to confirm the applicable particle-size information and evidence.

Does the luting-sand package image show its particle size?

No. It establishes product identity, not formulation or a particle-size value.

What makes the question technically useful?

Tie it to the mould, rail profile, joint condition, welding procedure and acceptance or inspection route.